Yokneam 6 Pumping Station

 

Client: Northern Region Mekorot
On the project: Backing the water supply to the Megiddo - Ramat Menashe and Yokneam area from the National Water System.
Planning and execution of a pumping station, which includes two pumping units with capacity of 225 m/qm and in pressure of 160 meters.
The pumping station was designed as an extension of the existing Yokneam drilling yard, due to that, it was designed to be executed in a gradual manner in order to enable the continuous operation of the existing drilling for the execution period.
The project was successfully completed and operating.

 

 

 

 

 