main manu
 

Ravid Connector Line To Lower Tzalmon Stream

 

Client: Northern Region Mekorot
On the project: As part of the Mekorot project to pump water to the Sea of Galilee, a water outlet system was designed to The Tzalmon stream.
The architecture of the facility was designed with meticulous attention to the special scenic environment, and in coordination with the Israel Nature and Parks Authority and the Israel Antiquities Authority. The project includes a hidden facility from which the naturally flowing water will slide into the Zalmon Stream gorge.

 

 

 

 

 

Accessibility

SloganDesign