Customer: Mekorot
On the project: This water line is a part of Mekorot's plan to reinforce the water supply in the Wadi Ara area and to the new city Harish and is designed to reinforce the transmission capacity from the national carrier to the east.
The design included:

  • In the western section a steel pipe with a diameter Φ42 (900 meters).
  • In the eastern section a steel pipe with a diameter Φ32 (1500 meters).
  • Crossing Road 475 in horizontal drilling.
  • Crossing Road 6 and a gas strip in a pushing tunnel.
  • The project was successfully completed and operating

 

 

 

 

 