Client: Northern Region Mekorot
On the project: responding to the expected increase in consumption in the Krayot due to development plans and examining an alternative to the location of tanks that are located outside the area designated for urban development.
As part of the plan, the tanks are planned to be relocated out of the area designated for urban development at the height of 60+meters.
The master plan includes two tanks with a total volume of 65,000 Cubic meters, a main line with a diameter of "64/"60" that will connect the new tanks to the existing water network, strengthening the existing supply routes and executing new supply lines.

 

 

 

 

 