main manu
 

Majerse Site – Wastewater Disposal System

 

Client: Israel Nature and Parks Authority
About the project: a system for absorbing the Majerse touristic site sewage (raw sewage) and discharging them into Had-Ness Sewage treatment plant.
The planned system includes gravitational sewage lines, a discharging station that includes two screw pumps 25 qm/h pressure 15bar, and discharge Paxgol line of 160 mm in diameter, 2 km long.
The project was successfully completed and operating.

 

 

 

 

 

Accessibility

SloganDesign