Customer: Mekorot
On the project: Planning a new pumping station to transfer water from the national carrier from the Mishmarot Area (Mekorot center region) to the Mei Ami water tanks area (Mekorot northern region).
The new pumping station will include 3 pumping units with a flow of 1,000 mph each.
Besides this station, the project includes matching all other components in the existing facility: 2 pumps with a flow of 500 mph each and integration of "Wadi Ara 3" well in the station compound.
In order to accommodate all the pumping equipment required in the area of the existing yard, the existing generator and diesel tanks have been cancelled and, in their place, a switching structure of the electric company was designed to back emergency power supply from two Different substations.

 

 

 

 

 