Client: Northern Region Mekorot
On the project: As part of the construction of a new plant designed to reinforce the water supply to the upper Sea of Galilee basin, a steel line of 64" diameter and 18 km was carried out, beginning with a new pumping station at the Eshkol site and its end at the beginning of the national carrier canal in the Area of Eilabun.
The first section of the line passes through the Eshkol site, the second section of the line passes parallel to the Netofa Canal. Along the line, two 64" diameter buffer bodies were installed in underground concrete trenches.

 

 

 

 

 